A. Engineering and superintendence services in connection with public improvement projects shall be charged in accordance with the schedule below, when either the City does design and survey or a consultant does design and survey. Direct cost shall be computed in accordance with the provisions of Section 5.48.030. The City Engineer shall review actual costs of engineering and superintendence to insure that only usual and ordinary costs are included.
|
Final Engineer’s Estimate
|
|
Engineering and Superintendence Fee
|
|
Under $10,000
|
75% of direct cost
|
|
$10,001 to 25,000
|
85% of direct cost
|
|
Over $25,000
|
100% of direct cost
|
B. For public improvement projects for which the City does design and survey, application for a permit requires a deposit of one‑half of the estimated total permit fee; the balance of the fee is due prior to issuance of the permit. For projects for which a consultant does design and survey, application for a permit requires a deposit of 20 percent of the estimated total permit fee; the balance of the fee is due prior to issuance of the permit.
C. Prior to the issuance of the certificate of completion by the City Engineer the fees charged to the permittee will be adjusted to agree with the actual costs of services as recorded by the City Engineer. The remaining balance, if any, after payment of all costs shall be returned to the permittee. If additional funds are required from the permittee, they shall be paid prior to the issuance of the certificate of completion.
|
| |